MONDAY 11.25.24 BOH AM WILL
Notes about the shift in general:
GFI on the roto cooler was tripped when we arrived. Luckily everything was still temping sub 40. At some point the cord was spliced to replace a ground, that splice was not very well covered (masking tape and some wire still exposed), it probably had stayed tucked safely into the back of the cooler for months, but must have been dragging on the floor when they cleaned last night, got wet and tripped the GFI. After drying the cooler was functional again. Immediately after that we discovered that roto had not been heating, the primary system was not lighting the burners, the auxiliary system was working fine so we ran on that today. We all put away BEK, SOFO, and PFG trucks. Houston Avocado actually arrived early today at 11:30am. Business was scattered and there was no solid rush. There was a good deal of prep to do after the weekend so that was the main focus.
Next shift be on the lookout for:
1.How many pies did we run on the timesheet?
4 across the board2. KMOD stuff:
3. Food stuff:
Everything looked and tasted good.
4. Sales for the shift:
5. Labor for the shift:
People:
Dough/Dish: Gerardo
Prep:
Z1R: Juan
Z2R:
Z3R:
Z1M: Pedro
Z2M:
Z3M:
Z4M:
Sub/Salad: Leo
6. How did you show love:
Made coffee for everyone. Helped with Garlic Knots.
7. What did you teach someone today?
8. Repair issues:
Roto will be addressed first thing tomorrow a.m. It should just be the pilot light.The stuff about the stuff:
Notes for FOH: Good shift.
Comments
Post a Comment